NIPO Fieldwork System Version 1.14
Shifts
Stores times and length of the CATI fieldwork shifts.
Shifts table
|
Fieldname
|
Description
|
Type
|
Length
|
NOT NULL
|
|
DayOfWeek
|
Day of the week
|
smallint
|
|
NOT NULL
|
|
ShiftNumber
|
Shift number
|
smallint
|
|
NOT NULL
|
|
StartHour
|
Starting hour
|
smallint
|
|
NOT NULL
|
|
StartMin
|
Starting minute
|
smallint
|
|
NOT NULL
|
|
ShiftLength
|
Shift length in minutes
|
smallint
|
|
NOT NULL
|
|
Description
|
Description
|
nvarchar
|
|
|
|
|
|
|
|
|
Note: The shifts that are used by the NIPO CATI / Web Master (configurable via the NIPO CATI / Web Manager) and the shifts as stored in the Shifts table (used by the planning tool in NIPO FMS) are set independently. Make sure the shifts in both systems correspond when using results from the NIPO CATI / Web Master as input for the planning tool in NIPO FMS and/or the fieldwork history and fieldwork report.
|